yazriel0 on July 17, 2024 6:19 am If i undersstand correctly, EPC includes engineering, construction and components. 2024 bids are awarded at 2-3RMB $400-$300/KW with the low end in large remote projects or the mega-zones
1 Comment
If i undersstand correctly, EPC includes engineering, construction and components.
2024 bids are awarded at 2-3RMB $400-$300/KW with the low end in large remote projects or the mega-zones